summary
| |
Create an entity Switch to group n Racks.
|
|
Assignee: Pedro Navarro Pérez
|
|
|
| |
RPC Fault exception when access to infrastructure with session timeout
|
|
|
|
|
|
| |
Can not modify availables/unavailables IP after creation
|
|
|
|
|
|
| |
Remote services state are not checked when modified
|
|
|
|
|
|
| |
OVF repository codification.
|
|
|
|
|
|
| |
Improve VLAN tag selection
|
|
|
|
|
|
| |
Wrong hour format in some notifications
|
|
|
|
|
|
| |
Some VM are not powered on/off when power on/off several VM simoutaneously
|
|
Assignee: Pedro Navarro Pérez
|
|
|
| |
Check if the DNS, Gateway and suffix DNS are asigned
|
|
|
|
|
|
| |
Modify Deploy Virtual Appliance Icon to differenciate it with Power VM icon
|
|
|
|
|
|
| |
Avoid NullpointerException at com.sun.ws.management.server.servlet.WSManServlet.sendResponse
|
|
Assignee: Pedro Navarro Pérez
|
|
|
| |
Advise file limit size when uploading an image in Main Repository
|
|
|
|
|
|
| |
Improve error when download images fail
|
|
|
|
|
|
| |
Low severity of "Not enough resources in Hypervisor" message
|
|
|
|
|
|
| |
OVF manager doesn't compile in offline
|
|
|
|
|
|
| |
Get Virtual Machine state when refresh during deploy/power on/ff
|
|
|
|
|
|
| |
Virtual Apps list allows repeated names
|
|
|
|
|
|
| |
Modify hard/Soft limit message
|
|
|
|
|
|
| |
Can not refresh a repository space
|
|
|
|
|
|
| |
|
|
|
Assignee: Pedro Navarro Pérez
|
|
|
| |
|
|
|
Assignee: Pedro Navarro Pérez
|
|
|
| |
Server changes in OVFFromVirtualAppliance- include default datastore
|
|
Assignee: Pedro Navarro Pérez
|
|
|
| |
VirtualFactory changes - Take in to account the datastore included in the OVF erasing the config variable
|
|
Assignee: Pedro Navarro Pérez
|
|
|
| |
Specify better error 'A file was not found' when deploying a VApp
|
|
|
|
|
|
| |
Need to change error message when there is not enough space to deploy image
|
|
|
|
|
|
|
Toggle column visibility |
- Bug: 98
- Improvement: 61
- Story: 6
- Task: 2
-
Total issues: 167
- To Do: 11
- Unresolved: 11
- In Progress: 0
- Resolved: 156
- Done: 156
-
Time estimate:
1w
-
Time spent:
0m
-
Time remaining:
40h
-
Business Value:
0
-
Story Points:
0
-
Master:
None
-
Start date:
???
-
Release date:
None
- Bug: 20
- Improvement: 23
- Story: 1
- Task: 1
- Technical task: 8
-
Total issues: 53
- To Do: 5
- Unresolved: 5
- In Progress: 1
- Resolved: 48
- Done: 47
-
Time estimate:
3d 4h 10m
-
Time spent:
1h
-
Time remaining:
27.167h
-
Business Value:
0
-
Story Points:
29
-
Master:
None
-
Start date:
???
-
Release date:
31/Mar/11
- To Do: 0
- Unresolved: 0
- In Progress: 0
- Resolved: 1
- Done: 1
-
Time estimate:
0m
-
Time spent:
0m
-
Time remaining:
0h
-
Business Value:
0
-
Story Points:
0
|